Description
Half of the Honoré Mercier Bridge will be closed for seven weeks from Friday, June 20, at 9:00 p.m. to Monday, August 11, at 5:00 a.m. One lane will be open per direction while work takes place.

During this period, major work will take place day and night to replace a section of the deck on the federal portion of the Honoré Mercier Bridge, as well as to replace expansion joints and bridge bearings, and to carry out paving and marking work.
Text
  • 1. REHABILITATION OF THE HONORÉ MERCIER BRIDGE FEDERAL SECTION WORK PLAN 2014
  • 2. FOLLOW UP ON THE PROJECT
  • 3. Pier 14 3 Ramp 4 139 SLABS INSTALLED Ramp 2 188 SLABS INSTALLED Ramp 3 120 SLABS INSTALLED + 73 FOR THE BIKE PATH FEDERAL SECTION WORK COMPLETED Pier 32 Maline Island East Side Montréal Direction 116 SLABS INSTALLED
  • 4. FEDERAL SECTION 2/3 OF THE WORK COMPLETED BEFORE 2014 SUMMARY OF THE WORK BEFORE 2014 636 SLABS REPLACED 346 SLABS TO BE INSTALLED
  • 5. WORK PLANNED IN 2014
  • 6. 6 XX X Pier 14 Pier 27 2014 WORK 120 SLABS TO INSTALL + 73 SLABS FOR THE BIKE PATH X ONE LANE / DIRECTION Work zone WORK DAY AND NIGHT SEVEN WEEKS SUMMER 2014
  • 7. MALINE ISLAND SECTION SEAWAY SECTION CONVERGENCE SECTION 7 2014
  • 8. 8 LASALLElSOUTH-SHOREl MALINE ISLAND SECTION TOWARDS THE SOUTH-SHORE ONE LANE OPEN PER DIRECTION
  • 9. WORK SCHEDULE
  • 10. Honoré Mercier Bridge 2014 WORK SCHEDULE SEVEN CONSECUTIVE WEEKS APRIL MAY JUNE JULY AUGUST SEPTEMBER
  • 11. OVERVIEW OF WORK TO COME
  • 12. SLABS CUT AND REMOVED
  • 13. INSTALLATION OF THE NEW CONCRETE DECK SLABS
  • 14. INSTALLATION OF THE NEW CONCRETE DECK SLABS
  • 15. NEW VS OLD DECK NEW OLD
  • 16. SLABS ANCHORERD TO STEEL STRUCTURE
  • 17. HIGH LEVEL OF PRECISION DURING THE INSTALLATION
  • 18. INSTALLATION OF NEW BEARING DEVICES
  • 19. INSTALLATION OF NEW EXPANSION JOINTS
  • 20. POST-TENSIONING OF THE DECK SLABS (INSTALLATION OF STEEL CABLES)
  • 21. INSPECTION AND FINAL PAVING OF THE BRIDGE
  • 22. 22 MERCIERBRIDGE.CA